Work continues at the Midfield Satellite Concourse, which is slated to open in the third quarter of 2020.

 

(Los Angeles, CA) Each month, Los Angeles World Airports shares updates on current and upcoming construction projects at Los Angeles International Airport (LAX). As the airport is in the midst of a multibillion-dollar modernization program, new projects are starting with regular frequency. This newsletter contains information about the status of projects within the terminals at LAX, as well as construction impacts to the airport roadways and the surrounding communities.

Earlier this year, LAX introduced the @FlyLAXstats Twitter feed, which provides frequently updated traffic, parking and TSA wait time information. 

An interactive map that includes current construction projects can be found here: https://www.flylax.com/en/lax-traffic-and-ground-transportation/airport… Click on the hard hats for more information about specific lane closures and construction projects.

The right drop-off lane on the Upper/Departures Level is being used as a pedestrian walkway during
construction of Terminal 1.5, which will connect Terminals 1 and 2.

Roadway and Transit Impacts in the Central Terminal Area:

  • Terminals 1 and 2: The right-most drop-off lane on the Upper/Departures Level is closed to vehicles until March 2020 while it is used for a covered pedestrian walkway in the Terminal 1.5 construction area between Terminals 1 and 2. All of the inner lanes on the Lower/Arrivals Level will be closed overnight, with one lane reopened during the day, while work takes place on a water line under the roadway for approximately 10 days starting in mid-September.
  • Terminal 2 and 3: A section of the inner lanes on the Lower/Arrivals Level is scheduled to be closed Sept. 9-13 while work takes place to widen the center island curb. Curb space remains tight in the area and motorists are encouraged to consider parking in a structure when picking up passengers. The first 15 minutes are free in all parking structures within the Central Terminal Area, and it is only $5 for the first hour.
  • Tom Bradley International Terminal: The right-most pick-up lane on the Lower/Arrivals Level is closed between Columns B2 and B5 on the northern side of the terminal for use as a pedestrian walkway during work to add a new Automated People Mover (APM) core to the front of the building. Motorists are encouraged to consider parking or picking up pasengers south of the closure. The right drop-off lane is closed on the Upper/Departures Level for use as a pedestrian walkway during demolition of the canopy ahead of APM core construction.
  • Overnight lane closures: Some pick-up lanes on the Lower/Arrivals Level may be closed between 1 and 6 a.m. for utility location work of the Central Terminal Area traffic loop. Paving work will intermittently close the bus lane on the Lower/Arrivals Level from 1-8 a.m., with work taking place Monday-Friday mornings only through late August. During work, pedestrians will be directed to the nearest open stops.
  • Center Way: Center Way is scheduled to be closed between the exit for Parking Structure 1 and World Way on Wednesday, Sept. 11, from 1-9 a.m. for demolition of an overhead sign. Center Way is closed between the Tom Bradley International Terminal and West Way to allow for construction of the APM's West Station. Intermittent lane reductions are in effect Monday through Friday from 1-9 a.m. for underground utility work. The right-most lane adjacent to Parking Structure 7 will be closed overnight during work to demolish the parking booths and exit ramp from the roof.

An 800-foot section of Jetway Boulevard, between Westchester Parkway and the future 94th Street,
has opened to serve the relocated Avis Rental Cars lot and the ride app holding lot.

Impacts Near LAX:

  • Aviation Boulevard: A temporary detour route has opened to allow for the lowering of Aviation Boulevard and construction of a new 98th Street extension. The route may be closed overnight or on weekends to facilitate utility work.
  • Jetway Boulevard: An 800-foot section of the new road, which will eventually connect Westchester Parkway and Century Boulevard, has opened to serve the new Avis Rental Cars location and provide access to the ride app holding lot. The remainder of the road will open in 2023. Traffic signals and crosswalks have been installed at the intersection of Jetway Boulevard and Westchester Parkway to allowed controlled turns for employee parking.
  • Sepulveda Boulevard: Overnight lane closures are possible between Manchester Avenue and Century Boulevard as Caltrans performs pavement rehabilitation. The work will take place on weeknights between 12 a.m. and 4 a.m., and at least one through lane will remain open.
  • Streets Surrounding LAX: Intermittent, short-term lane closures may take place to conduct underground utility exploration as needed on streets in the LAX area. Streets include Century Boulevard, 96th and 98th Streets, Airport Boulevard, Westchester Parkway/Arbor Vitae Street, and Aviation Boulevard. At least one through lane of traffic will be maintained at all times and access to businesses will be maintained.

New carpeting has been installed in the west ticketing lobby at Terminal 3.

Terminal Construction/Renovation:

  • Terminal 1: Gate 10 is permanently closed for construction of Terminal 1.5. Gate 12A is closed until completion of Terminal 1.5. The pedestrian bridge connecting Parking Structure 1 and the terminal is closed, with signs placed to direct passengers.
  • Terminals 2 and 3: Because of construction guests should make sure they go to the correct terminal, as the indoor connectors on the Upper/Departures and Lower/Arrivals levels are closed for demolition work that begins later this month. According to Delta Air Lines, its passengers flying to all international destinations as well as Atlanta, Detroit, Hawaii, New York (JFK), Minneapolis/St. Paul and Washington National should check their bags in Terminal 2. All other domestic passengers should drop their bags at Terminal 3. Sky Priority passengers can drop their bags in either terminal. Guests in T3 are routed downstairs to a Security Screening Check Point on the Lower/Arrivals Level. Gate 22 is closed. New carpeting has been installed in the west ticketing lobby at Terminal 3.
  • Tom Bradley International Terminal: Due to APM core construction, the north escalators and stairs located outside the terminal are temporarily closed. Several offices on the Upper/Departures Level are scheduled to move in September due to the construction. The Customs and Border Protection office will be relocated near the south checkpoint escalators. The LAWA information desk will move across from Coffee Bean and Tea Leaf. International Currency Exchange will move to the north side of the terminal. A future AMEX Centurion Lounge is under construction through early 2020. Gate 131 is closed for construction of improvements to the baggage handling facility, and Gate 132 is closed until later this fall for work related to the Midfield Satellite Concourse. Work continues on an addition to the terminal near Gate 148 that will house elevators and escalators that access the tunnel to the new concourse. DFS Group Limited is conducting extensive renovation of its retail stores throughout 2019.
  • Terminals 4 and 5: A $1.6 billion renovation program continues. Baggage Carousels 1 and 2 in Terminal 4 are undergoing replacement. Two new carousels, numbered 5 and 6, are now available in Terminal 5. American Airlines' check-in counter in Terminal 5 has moved to the west end of the ticketing lobby, with JetBlue, Frontier, Sun Country and Allegiant scheduled to relocate their counters in early September. Signs will be posted to direct customers to the new locations.


Sprinkler installation in Parking Structure 3 will require closure of one level at a time through September.

Sidewalk/Walkway/Parking Structure Restrictions and Closures:

  • Real-Time Parking Updates: Guests can access maps with real-time information on how full parking structures within the Central Terminal Area and Economy Lot E are by visiting https://www.flylax.com/en/parking-at-lax. Parking rates and a calculator to estimate costs can also be found on this webpage. Parking availability can also be found on the @FlyLAXstats Twitter feed.
  • Terminals 1 and 2: Construction on Terminal 1.5 will narrow the sidewalk between Terminals 1 and 2 on the Lower/Arrivals Level. A covered walkway is located on the Upper/Departures Level, and will be in place until March 2020.
  • Parking Structures 3 and 4: The bridge between P3 and P4 has been demolished. Fire sprinkler installation has begun, temporarily closing portions of P3. The work will move to P4 once completed in P3. A temporary traffic pattern is in place due to enabling work for construction of the APM. An automated payment system has replaced the cashier booths, with motorists exiting the structures onto World Way. Because of construction in the area, the number of exit lanes is limited.
  • Tom Bradley International Terminal: On both levels, the right-most lane is being used as a pedestrian walkway during work to prepare for construction of an APM core.
  • Parking Structure 6: The pedestrian bridge between Parking Structure 6 and Terminal 6 has been removed. Guests should access Terminals 5 and 6 from the Lower/Arrivals Level.
  • Parking Structure 7: Over-height vehicles are no longer allowed on the roof of P7. Vehicles will exit the structure from the ground floor. An automated payment system has replaced cashier booths. Vehicles now use a temporary exit onto World Way South. Work is taking place to demolish the old cashier booths and ramp from the roof to Center Way.
  • Lot E: Economy Lot E is open at 5455 W. 111th St., offering approximately 2,700 long-term spaces for $12 a day.

Please note that all dates provided in this notice are subject to change. Up-to-date construction alerts showing roadway lane restrictions and sidewalk closures in the terminal loop, as well as a pedestrian walking map and helpful airline terminal finder, can be found at www.flyLAX.com. LAX also partners with Waze, the world’s largest community-based traffic reporting app, to provide enhanced information on conditions inside the airport and on nearby roadways.

Demolition of an overhead sign is scheduled to close a portion of Center Way on Wednesday, Sept. 11.

Updates on Other Projects:

  • Landside Access Modernization Program (LAMP): Demolition of several structures along Center Way including the connector bridges between Parking Structures 3/4 and 1/7 has been completed, paving the way for foundation work for the APM's elevated guideway to commence this fall. Site work is underway at the APM Maintenance and Storage Facility and the Intermodal Transportation Facility – West.
  • Airport Police Facility: Soil excavation work will resume in mid-September at the site for the future Airport Police Facility, located on the corner of Westchester Parkway and Loyola Boulevard. Parking will not be allowed on 94th Street west of Lincoln Boulevard for the duration of the project.

The curb between the inner and outer lanes on the Lower/Arrivals Level at Terminal 2 is scheduled to be widened by 4 feet in mid-September.



About Los Angeles International Airport (LAX)
LAX, the sixth-busiest airport in the world serving nearly 66 million guests in 2022, is owned and operated by Los Angeles World Airports (LAWA), a proprietary, revenue-generating department of the City of Los Angeles that also governs Van Nuys Airport (VNY). As the international gateway to the Southern California region, LAX and its partners are dedicated to meeting global airport standards for customer satisfaction, safety, regional economic leadership, organizational performance and sustainability.

To better serve the millions of domestic and international guests that travel through LAX each year, the airport is undergoing a multi-billion-dollar capital improvement program to modernize its entire campus. Initiatives underway include an Automated People Mover, a Consolidated Rental Car Facility and two projects that will each add over one million square feet to the airport's existing property: Terminal 9 and Concourse 0. For more information about LAX, its transformation and its environmental, social and local workforce commitments, please visit flylax.com. Follow LAX on X (formally Twitter), Instagram, LinkedIn, Facebook and YouTube.

As a covered entity under Title II of the Americans with Disabilities Act, the City of Los Angeles does not discriminate on the basis of disability and, upon request, will provide reasonable accommodation to ensure equal access to its programs, services, and activities. Alternative formats in large print, braille, audio, and other forms (if possible) will be provided upon request.