LAX Ops Advisory

May 09 2024, 08:30 AM
Runway 7L-25R Extended Runway Closure
Runway 7L-25R is scheduled to close on Saturday, May 18, 2024 from 0100L until 0800L.  This closure will support general upkeep of the runway, such as joint seal, mowing, and a paint refresh of a number of the runway markings. 
Apr 03 2024, 02:30 PM
Taxiway E Extended Daytime Closures for Taxiway T Rehabilitation Project: April 6th, 13th, 20th, 27th, 2024 - (0030 - 1600L)
Repaving of an asphalt pavement section between Runway 6R-24L and Taxiway E, at the Taxiway T intersection is upcoming. This work requires Saturday extended closures of Taxiway E (15.5 hours), between Taxiways K and D10.
Mar 05 2024, 02:30 PM
Taxiway E Closure Between Taxiway N and Taxiway P | March 06, 2024 - July 02, 2024

The Taxiway D Extension Project will be closing Taxiway E between Taxiway N and Taxiway P continuously from March 06, 2024 through July 2, 2024. This closure will allow construction of new concrete and asphalt pavement at the Taxiway E and Taxiway P intersection. 

Feb 29 2024, 02:30 PM
Runway 6R-24L Long Term Closure for North Airfield Exit Taxiways (NAET) Project March 06, 2024 through July 18, 2024 (Revision 1)

Runway 6R-24L will be closed for 132 consecutive calendar days (estimated) beginning March 06, 2024 (0030L/0830Z) through July 18, 2024, for Phase 4 of the North Airfield Exit Taxiways (NAET) Project. The NAET Project will construct four new exit taxiways south of Runway 6L-24R that will connect to Taxiways D and E by the end of the project.

Jan 19 2024, 02:45 PM
Taxiway E will be closed between Taxiway AA and Taxiway P from January 23, 2024 until July 2, 2024.

The Taxiway D Extension Project will be closing Taxiway E between Taxiway AA and Taxiway P continuously from January 23, 2024 through July 2, 2024. This closure will allow construction of future connector Taxiways V and W between Runway 24L and Taxiway E.  Due to the Taxiway E closure Taxiway Z will also be closed between Runway 24L and Taxiway E. 

Jan 19 2024, 02:30 PM
VSR "E" is closed permanently between VSR "K" and VSR "P".

Vehicle Service Road E (VSR "E") between VSR "K" and VSR "P" was permanently closed on Friday January 19, 2024. All service road traffic is now detoured south to VSR "D" between VSR "K" and VSR "P".  The permanent closure of VSR "E" between VSR "K" and VSR "P" is required to complete additional Taxiway D construction.

Jan 17 2024, 03:30 PM
Taxiway D between Taxiway P and Taxilane D14 will open on Friday, January 19, 2024

New Taxiway D will be opened between Taxiway P and Taxilane D14 on Friday, Januray 19, 2024 at 1400L. Taxiway D between Taxiway AA and Taxiway P and Taxilane D14 will be restricted to ADG IV or smaller (MD11/B767) to facilitate additional construction work. Vehicle Service Road (VSR) D between VSR P and Taxilane D14 will continue to be closed until further notice.

Dec 08 2023, 07:00 AM
Special Helicopter Operations: 12/13 & 12/15 on Taxiways "A" and "F' and Runways 7L/25R and 7R/25L.
We would like to make all airport users aware of some unusual helicopter operations that will take place on December 13th and 15th on Taxiways “A” and “F”, and Runways 7R/25L and 7L/25R
Dec 05 2023, 03:00 PM
Post 4 Closed Friday, December 8 through Sunday, December 10, 2023 - Daily 7 AM to 4 PM

To facilitate urgent repairs, Post 4 (10901 Aviation Boulevard) will be closed Friday, December 8 through Sunday, December 10, daily from 7 AM to 4 PM.

Please note that POST 4 will be open outside of these hours.

The following posts will be available for alternate access:

  • Post 1: 5814 Postal Road
  • Post 5: 7270 World Way West
  • Post 236B: 10385 Aviation Boulevard

Please note: Airline Catering vehicles MUST USE Post 5.

Nov 30 2023, 04:00 PM
Taxiway Name Changes

Effective November 30, 2023: Taxiway V will change name to Taxiway R and Taxiway W will change name to Taxiway T

Sep 09 2023, 01:30 PM
Runway 6L-24R Long Term Closure for the North Airfield Exit Taxiways Project September 12, 2023 - January 09, 2024
Phase 3 of the North Airfield Exit Taxiways (NAET) Project that will construct 4 new runway exit taxiways between Runway 6L-24R and Taxiway E begins on Tuesday, September 12, 2023 at 0030 PDT. Runway 6L-24R will be continuously closed for 119-day starting on Tuesday September 12, 2023 at 0030 PDT. Estimated reopening of Runway 6L-24R is January 09, 2024. 
Sep 08 2023, 03:00 PM
On Tuesday, September 12, 2023 at 0630L, Phase 3 of the Taxiway D Extension Project will be completed and the newly constructed Taxiway D between Taxiway AA and Taxilane D14, and Taxilane D14 will be opened.
On Tuesday, September 12, 2023 at 0630L, Phase 3 of the Taxiway D Extension Project will be completed and the newly constructed Taxiway D between Taxiway AA and Taxilane D14, and Taxilane D14 will be opened.  
 
When Taxiway D between Taxiway AA and D14 and Taxilane D14 are opened, they will be restricted to Aircraft Design Group IV (ADG IV) or smaller (MD11/B767).  This restriction will be required due to future construction limits and will be in place until July 5, 2024 (Estimated).
 
Taxilane E14 will be permanently closed at 0030L on Tuesday, September 12, 2023. The new entrance to the FedEx Apron and hangar will be from Taxiway AA to Taxiway D and Taxilane D14, starting at 0630L on September 12, 2023.

LAX Operations Advisory

Back To Top